LTA CCL3 C852

Construction of underground Serangoon Interchange Station

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Build
Serangoon, Singapore
2003 - 2008
5.8m I.D.
EPB Machine
3,800m
Bored Tunnels

The Circle Line Stage 3 C852 project is a build-only project which STECS undertook in a joint venture with Woh Hup and Alpine Mayreder. This project includes construction of Serangoon interchange station, the interconnecting tunnels from Serangoon station to Lorong Chuan station, and from Serangoon station to Bartley station. Two 6.35m diameter EPS machines were used to construct the bored tunnels.

C852 Awards
2011

2010


2009
LTA Best Managed Infrastructure

LTA Best Managed Infrastructure
Construction Excellence Merit Award

WSH Performance Silver Award
Related Projects
T225_Substantial Completion_edited_edite

Construction of four Circle Line Stage 1 stations situated in the vicinity of Singapore's iconic landmarks

C825
Promenade, Esplanade, Bras Basah
and Dhoby Ghaut Station
T305_Concourse_1_edited_edited.jpg

Construction of a basement retail concourse, car park and two-directional, two-line MRT section tunnels