PUB DTSS T-01

Deep Tunnel Sewerage System - Changi Tunnel

Client:         
Contract:   
Location:   
Period:    
Public Utilities Board
Design and Build
Changi, Singapore
2000 - 2005

The Deep Tunnel Sewerage System Phase 1 T-01 project is the first design and build project for which STECS undertake in the name of a joint venture with Woh Hup. This project features the use of New Austrian tunneling method and tunnel boring method. A 7.2m diameter EPB Machine was used to construct the bored tunnels. The contract value is S$80.6 million.