Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA TWE C1688
Construction of Tuas West Extension Station and Viaduct
Client:
Contract:
Location:
Period:
Land Transport Authority
Build
Tuas, Singapore
2011 - 2016
3,650m
First Viaduct
Elevated Viaduct
Project in Singapore
1/3
Tuas West Extension project C1688 include the construction of one elevated 3-storey interchange station Gul Circle and 3.05km of elevated MRT viaduct. In addition, a further 600m of elevated viaduct for the Tuas South Extension (TSE) were constructed. It is STEC's first viaduct project in Singapore.