T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA JRL J102
Design and Construction of Choa Chu Kang Station, Choa Chu Kang West Station, Tengah Station and Viaduct including Addition and Alteration Works to the Existing Choa Chu Kang Station
Client:
Contract:
Location:
Period:
Land Transport Authority
Design and Build
Choa Chu Kang, Singapore
2019 - 2026
Three
4,300m
Elevated Stations
Viaduct
1/7
The Jurong Region Line J102 project comprises works to design and construct Choa Chu Kang, Choa Chu Kang West and Tengah Station with a 4.3-km viaduct between Choa Chu Kang and Tengah along Choa Chu Kang Ave 3. This project also includes addition and lateration works to the existing Choa Chu Kang station on the North-South Line, to integrate it with the new JRL station.