top of page
T316
Underground Infrastructure
Changi Airport
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA CRL CR203
Design and Construction of Turf City Station and Tunnels for Cross Island Line
Client:
Contract:
Location:
Period:
Land Transport Authority
Design and Build
Turf City, Singapore
2024 - 2032
5.8m I.D.
3,000m
Slurry TBM Machine
Bored Tunnels
1/4
Contract CR203 involves the design and construction of an Underground CD station Turf City Station and a 3km bored tunnel towards CR205 King Albert Part Station.
The tunnel will be constructed with two slurry TBM. The contract also comprises a TBM launch shaft and a new road connecting the Station to Eng Neo Avenue.
bottom of page