LTA CRL CR202

Design and Construction of Bored Tunnel between Fairways Drive and Sin Ming Walk

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
Singapore
2023 - 2032
12m Dia.
5,000m
Slurry TBM
Bored Tunnels

Contract CR202 involves the design and construction of a 5km large-diameter tunnel between Fairways Drive and Sin Ming Walk. STEC undertakes the project in a joint venture with Obayashi Corporation. Two kilometres of the tunnel will under-cross the Central Catchment Nature Reserve. The bored tunnel will also cross underneath Eng Neo Avenue Forest, Windsor Nature Park, Peirce Secondary School, Pan Island Expressway (PIE), and Upper Thomson Road.

The tunnel - containing two mainline tracks - will be constructed with a large TBM, which measures approximately 12m in diameter. The contract also comprises a TBM launch shaft, transition tunnels to Future Underground Infrastructure, a Facility Building, and a Temporary Staging Area. OC-STEC CR202 JV's construction approach will optimise productivity while ensuring strict compliance with environmental requirements.

Related Projects
T225_Substantial Completion_edited_edite

Design and construction of 6-km long tunnels between Aviation Park Station and Changi East Depot.

CR102
Cross Island Line
T305_Concourse_1_edited_edited.jpg

Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2.

T316
Underground Infrastructure Changi Airport
bottom of page