top of page
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA TEL T310
Construction of Bayshore Station and its Associated Tunnels
Client:
Contract:
Location:
Period:
Land Transport Authority
Build
Bayshore & Upper East Coast
2016 - 2023
120,381m³
Concrete
4,300m
Bored Tunnels
1/10
The Thomson-East Coast Line T310 project is undertaken by STECS in a joint venture with Woh Hup. The project includes the construction of underground Bayshore Station with five entrances, bored tunnels between Bayshore Station and Siglap Station and between Bayshore Station and Bedok South Station, one escape shaft and one cross passage. Three 6.35m diameter EPB machines will be used to construct the bored tunnels. The contract value is S$295.86 million.
T310 Awards
2021
2019
2017
MOM WSH (SHARP) Award
LTA ASAC Best WSHO Award
MOM WSH (SHARP) Award
Related Projects
bottom of page