top of page

LTA TEL T225

Construction of Shenton Way Station and its Associated Tunnels

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
Singapore
2016 - 2023

The Thomson Line T225 project include the construction of 5 storey underground Shenton Way Station. Bored tunnels between Shenton Way Station and Maxwell Station and between Shenton Way Station and Marina Bay Station. The station also has three entrances and new passageway links connecting to adjacent buildings. Two 6.35m diameter EPB machines are used to construct the bored tunnels.

Related Projects
T225_Substantial Completion_edited_edite

A Thomson-East Coast Line project featuring the construction of an underground station with 2 entrances and associated tunnels

T305
Katong Park Station
bottom of page