top of page
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA TEL T225
Construction of Shenton Way Station and its Associated Tunnels
Client:
Contract:
Location:
Period:
Land Transport Authority
Design and Build
Singapore
2016 - 2023
1/6
The Thomson Line T225 project include the construction of 5 storey underground Shenton Way Station. Bored tunnels between Shenton Way Station and Maxwell Station and between Shenton Way Station and Marina Bay Station. The station also has three entrances and new passageway links connecting to adjacent buildings. Two 6.35m diameter EPB machines are used to construct the bored tunnels.
bottom of page