top of page
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA T206
Construction of Tunnels at Woodlands
Client :
Contract :
Location :
Period :
Land Transport Authority
Build
Woodlands, Singapore
2013 - 2019
6.73m
EPB Machine
6,150m
Bored Tunnels
1/5
Thomson Line T206 project include the construction of mainline bored tunnels between Woodlands Station & Woodlands South Station and between Woodlands South Station and Sembawang Airbase. It also includes reception bored tunnels between Mandai Depot and crossover tunnels at Sembawang Airbase, associated four launching shafts, two escape shafts and four cross passages. Three 6.35m diameter EPB machines and two 6.35m diameter slurry TBMs will be used to construct the bored tunnels.
T206 Awards
2022
2021
2018
2017
LTA Land Transport Best Managed Project
Construction Excellence Award
MOM WSH (SHARP) Award
LTA ASAC Safety Merit Award
LTA ASAC Environment Merit Award
MOM WSH (SHARP) Award
2016
2015
LTA ASAC Safety Merit Award
MOM WSH (SHARP) Award
MOM WSH (SHARP) Award
Related Projects
bottom of page