top of page

Ongoing Projects

1 Ongoing
Picture7.jpg

Design and Construction of Turf City Station and 3km long bored tunnel towards CR205 King Albert Park Station for the Cross Island Line Phase Two.

CR203
Cross Island Line
CR202 tunnel 1.png

Design and Construction of a 5-km long bored tunnel between Fairways Drive and Sin Ming Walk for the Cross Island Line Phase Two.

CR202
Cross Island Line
2 Ongoing
CR102.png

Design and construction of 6-km long tunnels between Aviation Park Station and Changi East Depot.

CR102
Cross Island Line
20221101_011623594_iOS.png

TWRP Contract 1

Tuas Water Reclamation Plant

A 6m diameter tunnel undersea with a length of 1.6km and twin 2200mm & 1200mm diameter water pipelines connecting Tuas Water Reclamation Plant and Jurong Island 

TWRP Contract 1
Tuas Water Reclamation Plant
3 Ongoing
微信图片_20220923110429.jpg

T316

Underground Infrastructure Changi Airport

 

Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2

T316
Underground Infrastructure Changi Airport
DJI_0337.JPG

An 800 m long road tunnel featuring 

a pair of three-lane roads to be integrated with Teck Ghee Station

on the future Cross Island Line

N109A
North South Corridor
4 Ongoing
DJI_0507.JPG

Three stations and one 4.3 km viaduct 

along with Addition and Alteration Works

to the existing Choa Chu Kang Station

J102
Jurong Region Line
5. DJI_0505.JPG

A 6 km South Main Sewerage Tunnel and 5.5 km South Linkway Sewerage Tunnel.

T-11
Deep Tunnel Sewerage System Phase 2
5 Completed

Completed Projects

T305_Concourse_1.jpg

A Thomson-East Coast Line project featuring the construction of an underground station with 2 entrances and associated tunnels

T305
Katong Park Station
T310%2520Completed%2520Station%25201_edi

T310

Bayshore Station

 

A Thomson-East Coast Line project featuring the construction of an underground station with 5 entrances and associated tunnels

T310
Bayshore Station
6 Completed
WhatsApp Image 2021-11-30 at 12.30.19 PM (2).jpeg

A 108m tunnel constructed using Rectangular Pipe Jacking Machine which connects Funan Mall to Capitol Piazza.

Funan
Underground Pedestrian Linkway
DJI_0155_edited_edited.jpg

Construction of an elevated 3-storey Gul Circle interchange station and a 3.05 km elevated MRT viaduct

C1688
Tuas West Extension
7 Completed
8 Completed
T225_Substantial Completion_edited.jpg

A Thomson-East Coast Line project featuring the construction of an underground station with 3 entrances and associated tunnels

T225
Shenton Way Station
C920 newton.jpg

Construction of DTL2 Newton Station along with 4 tunnels connecting it to Little India and Stevens Stations

C920
Newton Station
IMG_20190809_103539.jpg

Construction of tunnels between Woodlands Station & Woodlands South Station and between Woodlands South Station & Sembawang Airbase.

T206
Tunnels at Woodlands
C902%20promenade_edited.jpg

Extension of the existing Promenade Station and construction of a 1.12 km interconnection tunnels

C902
Promenade Station
9 Completed
IMG_0875.JPG

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3

C923A
Tunnels between Tampines East and Upper Changi Stations
DSCF0304.JPG

Construction of a 48 m Cut & Cover tunnel and a two-tier box tunnel with the existing parking tunnel

C713
North-East Line Extension
10 Completed
photo-1525625293386-3f8f99389edd.jpg

Construction of a basement retail concourse, car park and two-directional, two-line MRT section tunnels

P8402
Marina Bay Sands
Integrated Resorts Development
Holland Village3.jpg

Construction of a basement retail concourse, car park and two-directional, two-line MRT section tunnels

C855
Holland Village, Buona Vista,
Kent Ridge and One North Station
11 Completed
_DSC8401.JPG

Construction of an underground station for Circle Line Stage 3 with interconnecting tunnels to Lorong Chuan and Bartley stations

C852
Serangoon Interchange Station
Bras%20basah%20Station%20C825_edited.jpg

Construction of four Circle Line Stage 1 stations situated in the vicinity of Singapore's iconic landmarks such as Raffles Hotel and Chijmes

C825
Promenade, Esplanade, Bras Basah and Dhoby Ghaut Station
12 Completed
PUB DTSS_edited.jpg

Construction of bored tunnels with a total length of 5.8 km for PUB DTSS Phase 1

T-01
Deep Tunnel Sewerage System Phase 1
bottom of page