T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
Singapore LTA T225
Construction of Shenton Way Station and its Associated Tunnels
2,280m
6.35m
Client: Land Transport Authority
Contract: Build
Location: Singapore
Period: 2015 - 2021
Bored Tunnels
EPB Machine Diameter
T225_Concourse_edited
T225 Bored Tunnels
T225 Project Site
T225_Concourse_edited
1/9
The Thomson Line T225 project include the construction of 5 storey underground Shenton Way Station. Bored tunnels between Shenton Way Station and Maxwell Station and between Shenton Way Station and Marina Bay Station. The station also has three entrances and new passageway links connecting to adjacent buildings. Two 6.35m diameter EPB machines are used to construct the bored tunnels. The contract value is S$368.16 million.
T225 Awards
2021 MOM WSH (SHARP) Award
2020 MOM WSH (SHARP) Award
2017 LTA ASAC Contractors Challenge Shield Award
LTA ASAC Environment Excellence Award
MOM WSH (SHARP) Award
2019 PUB Exemplary Earth Control Measures Officer Award
2018 LTA Annual Safety, Health and Environmental Award
Convention (ASAC) Contractors Challenge Shield Award
2016 LTA ASAC Contractors Challenge Shield Finalist
LTA ASAC Environment Excellence Award MOM WSH (SHARP) Award
LTA ASAC Environment Excellence Award
LTA ASAC Safety Excellence Award
MOM WSH (SHARP) Award