top of page
T316
Underground Infrastructure
Changi Airport
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2

.png)

.jpeg)
Funan Underground Pedestrian Link
Tunnel between Funan Mall and Capitol Piazza
Client: Woh Hup–Obayashi Joint Venture (Funan)
Contract: Design and Build
Location: Singapore
Period: 2017 - 2021
7630 x 6430
Rectangular Pipe Jacking Machine
1st Commercial UPL Project
with RPJM Method

Rectangular Pipe Jacking Machine

Segment Installation

Funan Underground Pedestrian Linkway

Rectangular Pipe Jacking Machine
1/8
Funan Underground Pedestrian Link project involves the construction and completion of a 108m long tunnel that connects Funan Mall with the existing basement of Capitol Piazza. Consisting of 68 segments, the tunnel was built using Rectangular Pipe Jacking Methodology (RPJM) which improves construction productivity while minimizing traffic disruption, utilities diversion and environmental impact.
Related Projects