T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
Singapore LTA CCL3 C852
Construction of underground Serangoon Interchange Station
3,800m
6.35m Dia.
Bored Tunnels
EPB Machine
The Circle Line Stage 3 C852 project is a build-only project which STECS undertook in a joint venture with Woh Hup and Alpine Mayreder. This project includes construction of Serangoon interchange station, the interconnecting tunnels from Serangoon station to Lorong Chuan station, and from Serangoon station to Bartley station. Two 6.35m diameter EPS machines were used to construct the bored tunnels. The contract value is S$155.95 million.
STEC C852 Project
Serangoon Interchange Station
STEC C852 Project
Serangoon Interchange Station